Renovation and retained buildings
Identify interfaces before removing part of a structure.
VIEW SERVICE
DEMOLITION / MENTONE 3194
Planning a Mentone rebuild or renovation? Tell us what must remain, how machinery can reach the site and which approval documents you already have.
MENTONE / KINGSTON CITY COUNCIL
Kingston’s Mentone Structure Plan provides activity-centre context, but the removal scope still starts with your property. A house knockdown and a renovation retaining a frontage, adjoining wall or occupied section need different briefs. Identify protected or retained features from current property documents rather than assuming an older building can be fully removed. If your site is near shops or the station, include public access and delivery constraints in the discussion without assuming neighbouring land is available for the job.
Local reference: Kingston: Mentone Structure Plan.
Exccell offers house demolition for knockdown rebuilds, garage and shed removal, partial demolition and internal strip-outs, and site clearing. The inspection defines the method and scope for your property.
COUNCIL & BUILDING CHECKS / MENTONE
An inspection helps define your project. It does not replace the planning and building checks for the actual property. Confirm who obtains each approval and include those responsibilities in the written scope.
Start with the address, title boundaries and current property controls. Identify what must remain before choosing the removal scope.
Kingston property informationCheck the demolition building permit, any planning approval and whether council report and consent is needed.
Discuss existing-condition records, the crossing and any proposed use of public space. Do not assume building approval covers every access arrangement.
Kingston asset protection permitsHave documents ready? Request an Exccell site inspection and add the plans and photos you have. Preferred times are confirmed by the team; demolition approval and a start date are not guaranteed by the booking request.
PREPARE YOUR ENQUIRY
Mark the rooms, facade, party walls, fences and services that stay. Supply drawings showing where new work meets retained construction.
Include the crossover, footpath, kerb and any street trees. Show the route from the street to the removal area and explain who controls it.
Tell us whether the next contractor needs slabs, footings or paving removed, or specific areas protected. Record these requirements in the written scope.
For pricing factors and written inclusions, use our demolition quote comparison checklist. Ask which permits, disconnections, hazardous-material work and concrete removal are included. No fixed price or approval timeframe is assumed.
HOUSE DEMOLITION / MENTONE
Adapt this starting brief to your property. It is an example request, not a record of a completed project or an approved scope.
I am planning house demolition in Mentone with some features potentially retained. I will mark any walls, fences, services and adjoining structures that must stay. Please assess whether a full knockdown or a separately defined partial-demolition scope fits the drawings and explain the inclusions in writing.
Use our demolition inspection brief builder to select the work and site details, then copy your notes into the booking request. For the wider process, see house demolition in Melbourne.
Preferred inspection times are confirmed by the team. A request does not confirm demolition approval, a fixed quote or a work start date.
MATCH THE SCOPE
Identify interfaces before removing part of a structure.
VIEW SERVICEMatch the removal brief to the proposed rebuild.
VIEW SERVICEInclude assessment and removal responsibilities in the quote.
VIEW SERVICELOCAL QUESTIONS / MENTONE
Practical answers about approvals, scope and site preparation. Requirements depend on the exact address and proposed work.
Start with the exact address and proposed removal scope. Planning approval, a demolition building permit and council report and consent are different checks. Ask your building surveyor which approvals apply before agreeing a start date. An inspection request or demolition quote does not authorise work.
Yes. Provide a plan that distinguishes removed and retained work, including shared walls and service connections. The inspection helps establish whether the proposed separation and access can be managed for your structure.
A general plan does not establish the controls on a particular home. Obtain current property information and ask the council or surveyor which heritage or other controls apply to your address.
Ask how the work plan addresses applicable Victorian safety duties, permit conditions and the relevant AS 2601 demolition requirements. Discuss adjoining structures, public protection, service isolation and material handling. The method must be assessed for the actual building; a general suburb guide is not a demolition plan.
Tell us about known surveys and any suspected materials before intrusive work. Materials that may be disturbed need assessment and the appropriate removal arrangements. Ask for the relevant credentials and written hazardous-material scope with your quote; appearance or the suburb name cannot establish whether asbestos is present.
Compare the same retention plan, concrete quantities and clearing standard. Ask who arranges permits, service isolation and any specialist work. A price for structural removal alone may not include the builder-ready handover you expect.
Do not assume permission from a photograph or an open gate. Identify the legal access route and ask which asset, public-space or traffic approvals are needed. Access to another property requires the appropriate agreement.
Yes. Explain which drawings and approvals are preliminary, and provide current photos. The team confirms your preferred inspection time; the removal scope and programme can change as the design and approvals are resolved.
The business handles enquiries 24/7. That does not mean demolition works occur overnight. Work hours depend on the site, approvals and applicable noise requirements. Agree the programme with the contractor and check the current council and EPA guidance before work starts.
Information reviewed 20 October 2026. Confirm the current requirements with the council responsible for your property, your building surveyor and the appointed specialists. Links describe approval processes; they do not establish approval for your project.
The project photograph is from Exccell's gallery; it is not presented as a completed job in this suburb.
Exccell Demolition Melbourne on Google Maps has our business updates and contact options. We come to your site in Mentone; request an inspection online and we will confirm the appointment.
Start your project
Request preferred inspection times and add the site photos and plans you have.